ME6512 THERMAL ENGINEERING LABORATORY – II L T P C
0 0 3 2
OBJECTIVES
- To study the heat transfer phenomena predict the relevant coefficient using implementation
- To study the performance of refrigeration cycle / components
LIST OF EXPERIMENTS:
HEAT TRANSFER LAB: 30
- Thermal conductivity measurement using guarded plate apparatus.
- Thermal conductivity measurement of pipe insulation using lagged pipe apparatus.
- Determination of heat transfer coefficient under natural convection from a vertical cylinder.
- Determination of heat transfer coefficient under forced convection from a tube.
- Determination of Thermal conductivity of composite wall.
- Determination of Thermal conductivity of insulating powder.
- Heat transfer from pin-fin apparatus (natural & forced convection modes)
- Determination of Stefan – Boltzmann constant.
- Determination of emissivity of a grey surface.
- Effectiveness of Parallel / counter flow heat exchanger.
REFRIGERATION AND AIR CONDITIONING LAB 15
- Determination of COP of a refrigeration system
- Experiments on Psychrometric processes
- Performance test on a reciprocating air compressor
- Performance test in a HC Refrigeration System
- Performance test in a fluidized Bed Cooling Tower
OUTCOMES
TOTAL: 45 PERIODS
- Ability to demonstrate the fundamentals of heat and predict the coefficient used in that transfer application and also design refrigeration cycle.
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS
S.No. |
NAME OF THE EQUIPMENT |
Qty. |
1 |
Guarded plate apparatus |
1 No. |
2 |
Lagged pipe apparatus |
1 No. |
3 |
Natural convection-vertical cylinder apparatus |
1 No. |
4 |
Forced convection inside tube apparatus |
1 No. |
5 |
Composite wall apparatus |
1 No. |
6 |
Thermal conductivity of insulating powder apparatus |
1 No. |
7 |
Pin-fin apparatus |
1 No. |
8 |
Stefan-Boltzmann apparatus |
1 No. |
9 |
Emissivity measurement apparatus |
1 No. |
10 |
Parallel/counter flow heat exchanger apparatus |
1 No. |
11 |
Single/two stage reciprocating air compressor |
1 No. |
12 |
Refrigeration test rig |
1 No. |
13 |
Air-conditioning test rig |
1 No. |
14 |
HC Refrigeration System |
1 No. |
15. |
Fluidized Bed Cooling Tower |
1 No. |
Post a Comment Blogger Facebook